SITE PLANNING
Using weather windows to protect the programme
6 min read

Weather does not have to turn into lost time. The key is to plan which tasks tolerate wet ground, high wind, or heat, and which tasks should move forward when the forecast gives you a reliable working window.
Separate weather-sensitive tasks
Identify activities that depend on dry access, stable trenches, or precise grading. Protect those tasks with contingency days, and keep lower-risk work such as workshop service, material sorting, or off-site preparation ready to fill a disrupted shift.
Review the forecast with the site team alongside plant availability. A machine positioned early on firmer ground can save a recovery operation later, while an unnecessary move can damage a route that needs to last all season.
Make the decision early
Set trigger points for rain, wind, and ground saturation before the day begins. Clear decisions taken early keep crews safe and allow the programme to adapt without confusion.
Plan for the people around the plant
A workable plan accounts for people as carefully as it accounts for machines. Separate pedestrian routes from plant movement, give spotters clear positions, and make sure everyone understands where visibility is limited. Safe separation is easiest to achieve before the site becomes busy.
Review the plan as work evolves. Stockpiles move, temporary roads change, and new trades arrive. A site plan is a live operating document, not a drawing that should remain untouched after the first day.